How do I flush out the system before installing a new Ideal i24 boiler?

Thoroughly flush out the whole system with cold water, fill and vent until the pressure gauge registers 1bar, check safety valve operation by raising pressure within 0.3 bar of preset lift pressure, release from system at minimum design pressure; 1.0 bar pre-pressurised.

From the official Ideal Boilers I 24 manual, page 14

Have a follow-up question?

Answers from the official manual.

Common questions