How do I install the jumper links?
Check input voltage available at site, move jumper links to match it and label on unit. Tighten link nuts to 25 in-lb (+/- 5 in-lb) (Page 24).
From the official Miller Electric CP 302 manual, page 24
Have a follow-up question?
Answers from the official manual.
Common questions