What clearances are required for installing the ProBlue 10?

The ProBlue 10 requires the following minimum clearances: 391 mm (15.4 in.) from hose to front face of melter; 268 mm (10.55 in.) to open the pump enclosure door; 656 mm (26.0 in.) from sub-base to tank lid when fully opened; and 714 mm (28.1 in.) on the left side to open the electrical enclosure door or remove a hose/gun module.

From the official Nordson ProBlue 10 Hot Melt Adhesive Dispenser manual, page 3

Have a follow-up question?

Answers from the official manual.

Common questions