What electrical power requirements does the ProBlue 10 have?

The ProBlue 10 power requirements at 230 volts are: 2 hoses/guns at 18 amps (1-phase), 16 amps (3-phase without neutral), or 10 amps (3-phase with neutral); 4 hoses/guns at 27 amps (1-phase), 24 amps (3-phase without neutral), or 17 amps (3-phase with neutral); and 6 hoses/guns at 36 amps (1-phase), 31 amps (3-phase without neutral), or 18 amps (3-phase with neutral). A lockable power disconnect switch must be installed between the electrical service and the melter.

Have a follow-up question?

AI-powered answers from the official manual. Verify critical info.

Common questions