How do I set up the Miller XMT 350 CC/CV for initial operation?
Begin by carefully unpacking the unit and positioning it on a stable, level surface. Connect the input power cable to the appropriate power source matching the unit's voltage specifications, attach the ground cable to a suitable grounding point, and connect the welding leads to the appropriate terminals. If using ArcReach® technology, ensure the remote control is properly connected and functioning.
Have a follow-up question?
AI-powered answers from the official manual. Verify critical info.
Common questions